Our Step By Step Process

 At ARF Solar, we ensure a seamless and efficient solar installation experience with our comprehensive process. Here’s how we bring your solar project to life 

Initial Phone Call and Electric Bill Collection

 Objective: Gather essential information to start the project.

  • Phone Consultation: Contact us to discuss your interest in solar energy and schedule a consultation.
  • Electric Bill Submission: Provide a recent electric bill so our design engineer can analyze your current energy usage and create an initial proposal.

Pre-Design Steps

Objective: Gather essential information to start the project.

  • Phone Consultation: Contact us to discuss your interest in solar energy and schedule a consultation.
  • Electric Bill Submission: Provide a recent electric bill so our design engineer can analyze your current energy usage and create an initial proposal.

Proposal Creation

 Objective: Present an initial proposal based on your electric bill.

  • Proposal Preparation: Our design engineer prepares a comprehensive proposal that includes system specifications, estimated energy savings, financing options, and preliminary design concepts.
  • Review: Review the proposal with you to ensure it meets your needs and expectations.

Site Survey and Analysis

 Objective: Collect detailed information to refine the system design.

  • Site Survey: Our design engineer visits your property to conduct a thorough assessment, including:
    • Roof Inspection: Evaluate roof condition, orientation, and pitch for optimal solar panel placement.
    • Shading Analysis: Identify potential shading issues from trees, buildings, or other obstacles.
    • Structural Assessment: Assess roof or mounting area to ensure it can support the installation.
    • Electrical System Review: Check the main panel and wiring for compatibility with the solar system.
    • Measurement and Layout: Take precise measurements and layout to finalize the solar array design.

Final Design Analysis

 Objective: Refine and finalize the system design based on site survey findings.

  • Design Review: Analyze the findings from the site survey to ensure the system design is optimized for performance and compliance. This includes:
    • Adjustments Based on Roof Condition: Modify the design if the roof condition requires different mounting solutions or additional reinforcement.
    • Shading Corrections: Update the design to account for any shading issues identified during the site survey. This might involve repositioning panels or using microinverters to mitigate shading effects.
    • Structural Changes: Make necessary design adjustments if the structural assessment indicates that the original design needs modification for stability.
    • Electrical System Compatibility: Refine the design based on any changes needed for the electrical system, such as upgrading the main panel or adjusting wiring layouts.

Pre-Approval

 Objective: Confirm eligibility and proceed with formal agreements.

  • Eligibility Review: Assess your eligibility for solar installation based on the finalized design and your property details.
  • Pre-Approval: Provide preliminary approval to move forward with formal contracts and permitting.

Contracts and Approvals

 Objective: Formalize agreements and secure all necessary approvals.

  • ARF Solar Contract: Review and sign the ARF Solar Contract, detailing terms and conditions, costs, payment schedules, and warranties.
  • Utility Interconnection Contract: Complete the Utility Interconnection Contract with your utility provider to establish the terms for connecting your solar system to the grid.
  • Final Review: Ensure all contracts and documentation are completed and approved before installation begins.

Installation

 Objective: Complete the installation of your solar system.

  • Preparation: Schedule and prepare the site for installation.
  • Installation: Install solar panels, inverters, and other system components according to the approved design. Residential systems almost always use microinverters for better performance and flexibility.
  • Inspection: Conduct an initial inspection to ensure correct and safe installation.

System Testing and Commissioning

 Objective: Verify the system operates correctly.

  • Testing: Perform thorough testing of the solar system to ensure proper operation.
  • Commissioning: Finalize the setup and ensure the system is fully operational.
  • Training: Provide instructions on system maintenance and monitoring.

Ongoing Support and Maintenance

 Objective: Offer continuous support and ensure system efficiency.

  • Monitoring: Provide ongoing monitoring to track system performance and address any issues.
  • Maintenance: Offer routine maintenance services to maintain long-term efficiency and reliability.
  • Customer Support: Provide dedicated support for any questions or concerns.

Review and Feedback

 Objective: Ensure satisfaction and gather insights.

  • Follow-Up: Conduct a follow-up to confirm your satisfaction with the installation and system performance.
  • Feedback: Collect feedback to continuously improve our services and customer experience.



*Process timeline and steps may vary on a client to client basis*

© 2025 ARF Solar, LLC. All Rights Reserved       

  • Privacy Policy
  • Terms of Service

This website uses cookies.

We use cookies to improve your experience and help us serve you better. By clicking accept, you're agreeing to our use of cookies.

Accept